Technical
Work smarter, build stronger with standards
Stay compliant with regulatory changes, drive innovation, and stay ahead of the industry with instant access to…
New CIBSE-certified CPD explains the potential of wireless lighting controls for retrofit
The CPD is designed to support the growing demand for smarter, more sustainable commercial building retrofits.
Silent treatment: acoustic design in an open plan school
The design brief for Trumpington Community College was for open teaching spaces overlooking a large, airy atrium. The challenge for Max Fordham’s acoustic engineers was…
To close the performance gap, choose Option D
IPMVP Option D offers robust measurement and verification to give building services engineers and their clients a better insight into how a design energy performance…
Hotel study reveals predicted hot water use is double the reality
Analysis of two hotels by Elementa Consulting revealed that actual hot-water use is around half of what systems are capable of supplying. Elementa’s David Glossop…
Countdown to zero – Leti roadmap to zero carbon buildings by 2030
The London Energy Transformation Initiative aims to support the construction of zero carbon buildings by 2030. It is creating a roadmap describing how this can…
Cost model – battery storage
Advances in battery technology and steep falls in prices for PVs and storage is making smart energy grids an attractive commercial proposition. Aecom’s first cost…
Data with destiny – BMS protocols
Building data offers valuable insights into performance, so it is essential protocols are in place to ensure digital information imported from the building management system…
Going to any length – chilled beams at Lambeth Civic Centre
Limited space and the need for flexibility helped drive the specification of chilled beams at Lambeth Civic Centre. Frenger’s Michael Ainley explains
Key changes in the updated Heat Networks Code of Practice
A major update to the Heat Networks Code of Practice includes key performance outputs that allow clients to check their networks are performing as designed.…
Closing the gaps: creating a joined up approach for ventilation and energy regulations
Guidance on energy and ventilation regulations must be more integrated, say researchers, after their study of UK airtightness tests showed air permeability is often too…
Climb every mountain: BIM from design to operation at Schneider Electric’s Grenoble campus
Can a single BIM model be used from design to operation? Schneider Electric was keen to find out if true BIM was achievable at two…













