Case Studies
Outstanding projects highlighting services design and operation
Leeds office achieves 5-Star NABERS UK Energy Rating
The 11&12 Wellington Place office development in Leeds has made history by becoming the first new building in the UK to achieve a 5-star NABERS…
The next industrial revolution: refurbishing the Power Hall
An innovative low carbon heating system – designed by Max Fordham and centred on water source heat pumps and an electric steam boiler — now…
Holy electric: Lambeth Palace’s £40m net zero retrofit
Balancing history and innovation, the £40m retrofit of Lambeth Palace demonstrates how a holistic approach can secure a low carbon future for historic estates. Andy Pearson…
Engineering for extremes: designing low-energy buildings
A college project in Niger, featuring local stone and passive ventilation, aims to change the perception of low-energy buildings in extreme climates. Molly Tooher-Rudd speaks to…
‘Walking the talk’: building performance at 20 Fenchurch Street
At 20 Fenchurch Street, collaborative, data-led interventions have improved building performance dramatically. Andy Pearson looks at how proactive facilities management and occupier engagement have reaped…
Boxing clever: sustainability at the Cathedral Hill Industrial Estate
Sustainability is often seen as a cost, but at Cathedral Hill Industrial Estate it’s become the key to a 220% rental uplift and a CIBSE award-winning retrofit.…







