Roundtable: reducing the environmental impact of data centres

As ever more powerful chips push server rack densities to extreme heights, the data centre industry faces mounting pressure to minimise energy and water use. In part two of our data centre roundtable, industry experts discuss potential solutions

Joined up heating:  integrated design

The fragmented nature of heat pump design and delivery can greatly undermine performance in commercial schemes, says Lochinvar’s Liam Elmore, who argues that an integrated approach is the best way to realise performance intent

TM39: Building metering and monitoring guide

The new TM39: Building metering and monitoring guide lays out the framework for developing a successful metering strategy. As well as case studies and analysis of real-life data, it includes key sections on validation, communications and cybersecurity. CIBSE’s Ellen Salazar provides an expert summary

Roundtable: Liquid cooling in data centres

As demand for AI pushes data centre rack power from 20kW to 130kW, the industry is hitting the physical limits of air cooling. Experts at a recent CIBSE Journal roundtable, held in collaboration with Tate, discuss how Nvidia’s new Blackwell chips are forcing a rapid transition to liquid cooling – and why engineers must design for a high-density future

Direct route to decarbonisation: Addenbrooke’s DC systems

Three innovative HVAC projects at Addenbrooke’s Hospital are demonstrating the benefits of integrating heat pump chillers, renewables and advanced controls using embedded DC microgrid principles. Andy Pearson talks to Arriba Technologies about how DC power can reduce energy waste and ease the burden on the Grid

Deep impact: decarbonising homes with mine-water

A pilot scheme connecting 16 homes to Gateshead’s mine-water heat network, using external heat interface units, proved that homes can be taken off gas with minimal disruption and without compromising comfort. FairHeat’s Nina Dungworth explains

Assuring fire safety competence: HRB Register

The first two engineers to pass through CIBSE’s higher-risk building registration share their experience with Ian Farrell, detailing the process and its impact on their daily practice